Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A guide to uninstall Primavera P6 Professional (x64) from your PC

This info is about Primavera P6 Professional (x64) for Windows. Here you can find details on how to remove it from your computer. It is produced by Oracle Corporation. More information about Oracle Corporation can be seen here. The program is frequently found in the C:\Program Files\Oracle\Primavera P6\P6 Professional\21.12.6 folder. Take into account that this location can differ being determined by the user's choice. The entire uninstall command line for Primavera P6 Professional (x64) is MsiExec.exe /I{70663750-6AF1-43D5-80F8-10BC8F1E287B}. Primavera P6 Professional (x64)'s main file takes about 32.75 KB (33536 bytes) and its name is Primavera.CacheService.exe.

The executables below are part of Primavera P6 Professional (x64). They occupy an average of 84.59 MB (88700896 bytes) on disk.

  • PM.exe (84.43 MB)
  • Primavera.CacheService.exe (32.75 KB)
  • Primavera.ImportExport.exe (29.25 KB)
  • Primavera.Launcher.DBconfig.exe (29.26 KB)
  • Primavera.SQLite.MigrateUI.exe (46.76 KB)
  • Primavera.Visualizer.exe (32.24 KB)
...click to view all...

The information on this page is only about version 21.12.6.44220 of Primavera P6 Professional (x64). You can find here a few links to other Primavera P6 Professional (x64) versions:

...click to view all...


A way to remove Primavera P6 Professional (x64) with Advanced Uninstaller PRO

Primavera P6 Professional (x64) is a program released by Oracle Corporation. Some computer users want to remove this application. Sometimes this is difficult because uninstalling this manually takes some advanced knowledge regarding Windows program uninstallation. One of the best EASY approach to remove Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here is how to do this:





1. If you don't have Advanced Uninstaller PRO already installed on your system, install it. This is good because Advanced Uninstaller PRO is a very useful uninstaller and all around tool to take care of your PC.

DOWNLOAD NOW

  • visit Download Link
  • download the setup by pressing the green DOWNLOAD NOW button
  • set up Advanced Uninstaller PRO
2. Start Advanced Uninstaller PRO. Take some time to admire Advanced Uninstaller PRO's design and wealth of functions available. Advanced Uninstaller PRO is a very useful PC management program.

3. Press the General Tools category
Go to General Tools


4. Press the Uninstall Programs tool
Go to Uninstall Programs


5. A list of the programs installed on the computer will appear

6. Navigate the list of programs until you find Primavera P6 Professional (x64) or simply click the Search field and type in "Primavera P6 Professional (x64)". If it is installed on your PC the Primavera P6 Professional (x64) program will be found automatically. Notice that when you select Primavera P6 Professional (x64) in the list of applications, some information regarding the application is made available to you:


  • Safety rating (in the lower left corner). The star rating tells you the opinion other people have regarding Primavera P6 Professional (x64), ranging from "Highly recommended" to "Very dangerous".
  • Reviews by other people - Press the Read reviews button.
  • Technical information regarding the application you wish to uninstall, by pressing the Properties button.
7. Press the Uninstall button. A confirmation window will come up. accept the uninstall by clicking the Uninstall button. Advanced Uninstaller PRO will then uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After uninstalling Primavera P6 Professional (x64), Advanced Uninstaller PRO will offer to run a cleanup. Click Next to perform the cleanup. All the items of Primavera P6 Professional (x64) which have been left behind will be detected and you will be able to delete them. By uninstalling Primavera P6 Professional (x64) using Advanced Uninstaller PRO, you are assured that no Windows registry entries, files or directories are left behind on your PC.

Your Windows system will remain clean, speedy and able to take on new tasks.



Disclaimer

This page is not a piece of advice to remove Primavera P6 Professional (x64) by Oracle Corporation from your PC, we are not saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application. This page simply contains detailed instructions on how to remove Primavera P6 Professional (x64) supposing you decide this is what you want to do. The information above contains registry and disk entries that other software left behind and Advanced Uninstaller PRO discovered and classified as "leftovers" on other users' PCs.

2023-06-06 / Written by Dan Armano for Advanced Uninstaller PRO

follow @danarm
Last update on: 2023-06-06 15:30:51.360