Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A way to uninstall Primavera P6 Professional (x64) from your system

You can find on this page details on how to remove Primavera P6 Professional (x64) for Windows. It was created for Windows by Oracle Corporation. Take a look here for more info on Oracle Corporation. Primavera P6 Professional (x64) is normally installed in the C:\Program Files\Oracle\Primavera P6\P6 Professional\20.12.7 folder, but this location may vary a lot depending on the user's option while installing the application. The entire uninstall command line for Primavera P6 Professional (x64) is MsiExec.exe /I{19FFA1FD-41BA-4E87-966F-05B8C8A26647}. Primavera P6 Professional (x64)'s primary file takes about 89.30 KB (91448 bytes) and is named Primavera.AdminConfig.exe.

Primavera P6 Professional (x64) is composed of the following executables which occupy 83.14 MB (87174496 bytes) on disk:

  • PM.exe (81.32 MB)
  • Primavera.AdminConfig.exe (89.30 KB)
  • Primavera.CacheService.exe (30.81 KB)
  • Primavera.ImportExport.exe (27.31 KB)
  • Primavera.Launcher.DBconfig.exe (27.32 KB)
  • Primavera.Visualizer.exe (30.30 KB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

The current page applies to Primavera P6 Professional (x64) version 20.12.7.40801 alone. You can find here a few links to other Primavera P6 Professional (x64) versions:

...click to view all...


How to delete Primavera P6 Professional (x64) from your PC with Advanced Uninstaller PRO

Primavera P6 Professional (x64) is a program by the software company Oracle Corporation. Sometimes, people decide to uninstall this program. This can be efortful because deleting this manually requires some know-how regarding PCs. One of the best EASY approach to uninstall Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here are some detailed instructions about how to do this:





1. If you don't have Advanced Uninstaller PRO on your system, add it. This is good because Advanced Uninstaller PRO is the best uninstaller and all around tool to optimize your PC.

DOWNLOAD NOW

  • navigate to Download Link
  • download the program by pressing the DOWNLOAD NOW button
  • install Advanced Uninstaller PRO
2. Run Advanced Uninstaller PRO. Take some time to admire Advanced Uninstaller PRO's design and number of features available. Advanced Uninstaller PRO is a very useful package of utilities.

3. Click on the General Tools button
Go to General Tools


4. Press the Uninstall Programs feature
Go to Uninstall Programs


5. All the programs installed on your computer will be made available to you

6. Navigate the list of programs until you locate Primavera P6 Professional (x64) or simply activate the Search feature and type in "Primavera P6 Professional (x64)". If it is installed on your PC the Primavera P6 Professional (x64) application will be found automatically. After you select Primavera P6 Professional (x64) in the list of applications, the following data about the application is shown to you:


  • Star rating (in the lower left corner). The star rating explains the opinion other people have about Primavera P6 Professional (x64), from "Highly recommended" to "Very dangerous".
  • Reviews by other people - Click on the Read reviews button.
  • Technical information about the application you are about to uninstall, by pressing the Properties button.
7. Press the Uninstall button. A confirmation dialog will appear. Confirm the removal by clicking Uninstall. Advanced Uninstaller PRO will then uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After removing Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run an additional cleanup. Click Next to start the cleanup. All the items of Primavera P6 Professional (x64) which have been left behind will be detected and you will be asked if you want to delete them. By uninstalling Primavera P6 Professional (x64) using Advanced Uninstaller PRO, you are assured that no Windows registry entries, files or directories are left behind on your computer.

Your Windows computer will remain clean, speedy and able to take on new tasks.



Disclaimer

The text above is not a piece of advice to remove Primavera P6 Professional (x64) by Oracle Corporation from your PC, nor are we saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application. This page only contains detailed info on how to remove Primavera P6 Professional (x64) supposing you decide this is what you want to do. Here you can find registry and disk entries that our application Advanced Uninstaller PRO stumbled upon and classified as "leftovers" on other users' PCs.

2021-09-01 / Written by Daniel Statescu for Advanced Uninstaller PRO

follow @DanielStatescu
Last update on: 2021-09-01 10:13:40.133