Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A guide to uninstall Primavera P6 Professional (x64) from your computer

This page contains detailed information on how to uninstall Primavera P6 Professional (x64) for Windows. It was developed for Windows by Oracle Corporation. Further information on Oracle Corporation can be found here. Primavera P6 Professional (x64) is usually installed in the C:\Program Files\Oracle\Primavera P6\P6 Professional directory, depending on the user's option. Primavera P6 Professional (x64)'s full uninstall command line is MsiExec.exe /I{4B567040-7E4F-474A-B202-37B495DD0769}. Primavera.ImportExport.exe is the programs's main file and it takes approximately 18.02 KB (18448 bytes) on disk.

Primavera P6 Professional (x64) is comprised of the following executables which occupy 83.44 MB (87489136 bytes) on disk:

  • dbconfig.exe (13.30 MB)
  • PM.exe (68.42 MB)
  • Primavera.ImportExport.exe (18.02 KB)
  • Primavera.Mimosa.exe (23.02 KB)
  • Primavera.SQLite.MigrateUI.exe (33.02 KB)
  • Primavera.Visualizer.exe (22.02 KB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

The information on this page is only about version 17.10.0.25544 of Primavera P6 Professional (x64). Click on the links below for other Primavera P6 Professional (x64) versions:

...click to view all...


How to remove Primavera P6 Professional (x64) from your computer using Advanced Uninstaller PRO

Primavera P6 Professional (x64) is a program released by Oracle Corporation. Sometimes, users decide to erase this application. Sometimes this can be troublesome because performing this manually requires some advanced knowledge related to removing Windows applications by hand. One of the best EASY procedure to erase Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here are some detailed instructions about how to do this:





1. If you don't have Advanced Uninstaller PRO already installed on your system, add it. This is a good step because Advanced Uninstaller PRO is a very useful uninstaller and all around tool to take care of your PC.

DOWNLOAD NOW

  • go to Download Link
  • download the setup by clicking on the green DOWNLOAD button
  • set up Advanced Uninstaller PRO
2. Run Advanced Uninstaller PRO. It's recommended to take your time to admire Advanced Uninstaller PRO's design and number of functions available. Advanced Uninstaller PRO is a powerful Windows optimizer.

3. Click on the General Tools button
Go to General Tools


4. Activate the Uninstall Programs tool
Go to Uninstall Programs


5. All the programs installed on the computer will be shown to you

6. Scroll the list of programs until you locate Primavera P6 Professional (x64) or simply click the Search field and type in "Primavera P6 Professional (x64)". The Primavera P6 Professional (x64) program will be found automatically. After you click Primavera P6 Professional (x64) in the list of apps, some information about the application is shown to you:


  • Star rating (in the left lower corner). The star rating explains the opinion other users have about Primavera P6 Professional (x64), ranging from "Highly recommended" to "Very dangerous".
  • Reviews by other users - Click on the Read reviews button.
  • Details about the program you wish to uninstall, by clicking on the Properties button.
7. Click the Uninstall button. A confirmation dialog will come up. Confirm the uninstall by clicking the Uninstall button. Advanced Uninstaller PRO will automatically remove Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After removing Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run an additional cleanup. Press Next to start the cleanup. All the items that belong Primavera P6 Professional (x64) that have been left behind will be found and you will be able to delete them. By uninstalling Primavera P6 Professional (x64) using Advanced Uninstaller PRO, you can be sure that no registry items, files or directories are left behind on your disk.

Your system will remain clean, speedy and ready to run without errors or problems.



Disclaimer

The text above is not a recommendation to remove Primavera P6 Professional (x64) by Oracle Corporation from your PC, we are not saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good software application. This text only contains detailed instructions on how to remove Primavera P6 Professional (x64) in case you want to. The information above contains registry and disk entries that Advanced Uninstaller PRO stumbled upon and classified as "leftovers" on other users' PCs.

2019-02-18 / Written by Andreea Kartman for Advanced Uninstaller PRO

follow @DeeaKartman
Last update on: 2019-02-18 06:26:45.100