Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A guide to uninstall Primavera P6 Professional (x64) from your computer

You can find below details on how to remove Primavera P6 Professional (x64) for Windows. It was created for Windows by Oracle Corporation. Open here where you can read more on Oracle Corporation. Primavera P6 Professional (x64) is typically set up in the C:\Program Files\Oracle\Primavera P6\P6 Professional\18.8.9 folder, but this location can vary a lot depending on the user's decision when installing the program. Primavera P6 Professional (x64)'s complete uninstall command line is MsiExec.exe /I{C9F8618A-3D57-493B-B146-A0EB73993FD5}. Primavera.CacheService.exe is the Primavera P6 Professional (x64)'s main executable file and it takes circa 140.35 KB (143720 bytes) on disk.

The executable files below are installed beside Primavera P6 Professional (x64). They occupy about 84.92 MB (89048192 bytes) on disk.

  • dbconfig.exe (13.96 MB)
  • PM.exe (69.11 MB)
  • Primavera.CacheService.exe (140.35 KB)
  • Primavera.ImportExport.exe (27.35 KB)
  • Primavera.SQLite.MigrateUI.exe (44.85 KB)
  • Primavera.Visualizer.exe (30.85 KB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

This info is about Primavera P6 Professional (x64) version 18.8.9.32166 alone. You can find below a few links to other Primavera P6 Professional (x64) versions:

...click to view all...


A way to erase Primavera P6 Professional (x64) from your computer using Advanced Uninstaller PRO

Primavera P6 Professional (x64) is an application by Oracle Corporation. Frequently, users choose to erase this program. This is troublesome because performing this manually takes some advanced knowledge regarding Windows program uninstallation. The best SIMPLE solution to erase Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here are some detailed instructions about how to do this:





1. If you don't have Advanced Uninstaller PRO on your Windows system, install it. This is a good step because Advanced Uninstaller PRO is a very potent uninstaller and all around tool to take care of your Windows system.

DOWNLOAD NOW

  • visit Download Link
  • download the program by pressing the green DOWNLOAD button
  • install Advanced Uninstaller PRO
2. Run Advanced Uninstaller PRO. It's recommended to take some time to get familiar with the program's interface and wealth of tools available. Advanced Uninstaller PRO is a very good Windows optimizer.

3. Click on the General Tools category
Go to General Tools


4. Press the Uninstall Programs button
Go to Uninstall Programs


5. A list of the programs existing on your PC will appear

6. Scroll the list of programs until you locate Primavera P6 Professional (x64) or simply click the Search feature and type in "Primavera P6 Professional (x64)". If it is installed on your PC the Primavera P6 Professional (x64) app will be found automatically. When you select Primavera P6 Professional (x64) in the list of programs, some data about the program is made available to you:


  • Star rating (in the lower left corner). This tells you the opinion other people have about Primavera P6 Professional (x64), from "Highly recommended" to "Very dangerous".
  • Reviews by other people - Click on the Read reviews button.
  • Technical information about the app you want to uninstall, by pressing the Properties button.
7. Click the Uninstall button. A confirmation page will come up. Confirm the uninstall by pressing Uninstall. Advanced Uninstaller PRO will uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After uninstalling Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run a cleanup. Click Next to start the cleanup. All the items of Primavera P6 Professional (x64) which have been left behind will be found and you will be able to delete them. By removing Primavera P6 Professional (x64) with Advanced Uninstaller PRO, you are assured that no Windows registry entries, files or folders are left behind on your system.

Your Windows computer will remain clean, speedy and ready to serve you properly.



Disclaimer

The text above is not a recommendation to remove Primavera P6 Professional (x64) by Oracle Corporation from your PC, we are not saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application for your computer. This page simply contains detailed info on how to remove Primavera P6 Professional (x64) supposing you decide this is what you want to do. Here you can find registry and disk entries that other software left behind and Advanced Uninstaller PRO discovered and classified as "leftovers" on other users' computers.

2021-06-12 / Written by Daniel Statescu for Advanced Uninstaller PRO

follow @DanielStatescu
Last update on: 2021-06-12 07:50:28.987