Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A way to uninstall Primavera P6 Professional (x64) from your system

Primavera P6 Professional (x64) is a computer program. This page holds details on how to uninstall it from your computer. It was created for Windows by Oracle Corporation. Take a look here where you can get more info on Oracle Corporation. The program is usually placed in the C:\Program Files\Oracle\Primavera P6\P6 Professional\24.12.0 directory (same installation drive as Windows). Primavera P6 Professional (x64)'s entire uninstall command line is MsiExec.exe /I{7D0693C7-C24B-4649-A4F4-17F2242202A2}. Primavera.CacheService.exe is the Primavera P6 Professional (x64)'s primary executable file and it takes circa 37.16 KB (38056 bytes) on disk.

The executable files below are part of Primavera P6 Professional (x64). They occupy about 85.91 MB (90084336 bytes) on disk.

  • PM.exe (85.73 MB)
  • Primavera.CacheService.exe (37.16 KB)
  • Primavera.ImportExport.exe (32.16 KB)
  • Primavera.Launcher.DBconfig.exe (31.16 KB)
  • Primavera.SQLite.MigrateUI.exe (48.66 KB)
  • Primavera.Visualizer.exe (34.16 KB)
...click to view all...

The current page applies to Primavera P6 Professional (x64) version 24.12.0.51267 alone. You can find below a few links to other Primavera P6 Professional (x64) versions:

...click to view all...


How to uninstall Primavera P6 Professional (x64) from your computer using Advanced Uninstaller PRO

Primavera P6 Professional (x64) is an application by Oracle Corporation. Sometimes, people choose to erase it. Sometimes this can be hard because performing this manually takes some skill regarding removing Windows programs manually. One of the best SIMPLE action to erase Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here is how to do this:





1. If you don't have Advanced Uninstaller PRO on your Windows system, install it. This is good because Advanced Uninstaller PRO is a very useful uninstaller and general tool to take care of your Windows PC.

DOWNLOAD NOW

  • visit Download Link
  • download the setup by pressing the DOWNLOAD button
  • install Advanced Uninstaller PRO
2. Start Advanced Uninstaller PRO. Take some time to admire Advanced Uninstaller PRO's design and wealth of functions available. Advanced Uninstaller PRO is a very useful Windows optimizer.

3. Click on the General Tools button
Go to General Tools


4. Click on the Uninstall Programs feature
Go to Uninstall Programs


5. All the programs installed on the computer will be made available to you

6. Navigate the list of programs until you find Primavera P6 Professional (x64) or simply activate the Search feature and type in "Primavera P6 Professional (x64)". The Primavera P6 Professional (x64) app will be found automatically. Notice that after you select Primavera P6 Professional (x64) in the list of programs, some information regarding the program is made available to you:


  • Star rating (in the left lower corner). The star rating explains the opinion other users have regarding Primavera P6 Professional (x64), ranging from "Highly recommended" to "Very dangerous".
  • Opinions by other users - Click on the Read reviews button.
  • Technical information regarding the app you are about to remove, by pressing the Properties button.
7. Press the Uninstall button. A confirmation dialog will appear. Confirm the removal by pressing Uninstall. Advanced Uninstaller PRO will uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After uninstalling Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run an additional cleanup. Click Next to perform the cleanup. All the items of Primavera P6 Professional (x64) that have been left behind will be found and you will be asked if you want to delete them. By removing Primavera P6 Professional (x64) with Advanced Uninstaller PRO, you can be sure that no Windows registry items, files or directories are left behind on your computer.

Your Windows computer will remain clean, speedy and ready to serve you properly.



Disclaimer

The text above is not a piece of advice to remove Primavera P6 Professional (x64) by Oracle Corporation from your PC, nor are we saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application. This text simply contains detailed info on how to remove Primavera P6 Professional (x64) supposing you want to. The information above contains registry and disk entries that our application Advanced Uninstaller PRO stumbled upon and classified as "leftovers" on other users' computers.

2024-12-28 / Written by Andreea Kartman for Advanced Uninstaller PRO

follow @DeeaKartman
Last update on: 2024-12-28 13:43:01.137