Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A way to uninstall Primavera P6 Professional (x64) from your PC

Primavera P6 Professional (x64) is a software application. This page contains details on how to uninstall it from your computer. It was coded for Windows by Oracle Corporation. More data about Oracle Corporation can be seen here. Usually the Primavera P6 Professional (x64) program is found in the C:\Program Files\Oracle\Primavera P6\P6 Professional\18.8.15 directory, depending on the user's option during install. Primavera P6 Professional (x64)'s entire uninstall command line is MsiExec.exe /I{C1BDEABE-5716-4247-AB7E-2F5518B1AFA9}. Primavera P6 Professional (x64)'s primary file takes around 89.53 KB (91680 bytes) and is called Primavera.AdminConfig.exe.

Primavera P6 Professional (x64) contains of the executables below. They occupy 133.23 MB (139705080 bytes) on disk.




  • dbconfig.exe (13.96 MB)
  • DistributedJobsAdmin.exe (3.76 MB)
  • PM.exe (69.20 MB)
  • Primavera.AdminConfig.exe (89.53 KB)
  • Primavera.CacheService.exe (140.53 KB)
  • Primavera.ImportExport.exe (27.53 KB)
  • Primavera.SQLite.MigrateUI.exe (45.04 KB)
  • Primavera.Standalone.Upgrade.UI.exe (71.55 KB)
  • Primavera.Visualizer.exe (31.02 KB)
  • prmjob.exe (27.18 MB)
  • PrmJobSv.exe (17.12 MB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

This web page is about Primavera P6 Professional (x64) version 18.8.15.33880 only. Click on the links below for other Primavera P6 Professional (x64) versions:

...click to view all...


A way to uninstall Primavera P6 Professional (x64) from your PC with Advanced Uninstaller PRO

Primavera P6 Professional (x64) is a program marketed by Oracle Corporation. Sometimes, computer users decide to remove it. Sometimes this is troublesome because performing this by hand takes some skill regarding Windows internal functioning. The best EASY procedure to remove Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here are some detailed instructions about how to do this:





1. If you don't have Advanced Uninstaller PRO on your system, install it. This is good because Advanced Uninstaller PRO is one of the best uninstaller and all around utility to optimize your PC.

DOWNLOAD NOW

  • visit Download Link
  • download the program by pressing the green DOWNLOAD button
  • set up Advanced Uninstaller PRO
2. Run Advanced Uninstaller PRO. Take your time to get familiar with Advanced Uninstaller PRO's interface and number of functions available. Advanced Uninstaller PRO is a very useful PC management program.

3. Press the General Tools category
Go to General Tools


4. Press the Uninstall Programs tool
Go to Uninstall Programs


5. All the programs installed on your PC will be made available to you

6. Scroll the list of programs until you locate Primavera P6 Professional (x64) or simply activate the Search field and type in "Primavera P6 Professional (x64)". The Primavera P6 Professional (x64) program will be found automatically. Notice that after you select Primavera P6 Professional (x64) in the list of apps, the following information regarding the application is made available to you:


  • Safety rating (in the lower left corner). The star rating explains the opinion other users have regarding Primavera P6 Professional (x64), from "Highly recommended" to "Very dangerous".
  • Opinions by other users - Press the Read reviews button.
  • Technical information regarding the program you are about to remove, by pressing the Properties button.
7. Click the Uninstall button. A confirmation dialog will appear. Confirm the removal by pressing Uninstall. Advanced Uninstaller PRO will uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After removing Primavera P6 Professional (x64), Advanced Uninstaller PRO will offer to run an additional cleanup. Press Next to go ahead with the cleanup. All the items that belong Primavera P6 Professional (x64) which have been left behind will be found and you will be asked if you want to delete them. By removing Primavera P6 Professional (x64) using Advanced Uninstaller PRO, you can be sure that no Windows registry entries, files or folders are left behind on your PC.

Your Windows system will remain clean, speedy and ready to serve you properly.



Disclaimer

The text above is not a piece of advice to uninstall Primavera P6 Professional (x64) by Oracle Corporation from your PC, nor are we saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application for your computer. This page simply contains detailed instructions on how to uninstall Primavera P6 Professional (x64) in case you decide this is what you want to do. The information above contains registry and disk entries that our application Advanced Uninstaller PRO stumbled upon and classified as "leftovers" on other users' PCs.

2022-09-14 / Written by Dan Armano for Advanced Uninstaller PRO

follow @danarm
Last update on: 2022-09-14 14:16:35.410