Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





How to uninstall Primavera P6 Professional (x64) from your PC

This info is about Primavera P6 Professional (x64) for Windows. Here you can find details on how to remove it from your computer. It was developed for Windows by Oracle Corporation. More data about Oracle Corporation can be read here. Primavera P6 Professional (x64) is typically set up in the C:\Program Files\Oracle\Primavera P6\P6 Professional\19.12.5 directory, subject to the user's choice. Primavera P6 Professional (x64)'s entire uninstall command line is MsiExec.exe /I{9942CE78-B676-444C-AC5E-66EAFBDFEB79}. Primavera P6 Professional (x64)'s main file takes about 140.13 KB (143496 bytes) and is called Primavera.CacheService.exe.

Primavera P6 Professional (x64) contains of the executables below. They occupy 85.07 MB (89202952 bytes) on disk.




  • dbconfig.exe (13.60 MB)
  • PM.exe (69.62 MB)
  • Primavera.CacheService.exe (140.13 KB)
  • Primavera.ImportExport.exe (27.63 KB)
  • Primavera.SQLite.MigrateUI.exe (44.64 KB)
  • Primavera.Visualizer.exe (30.63 KB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

This info is about Primavera P6 Professional (x64) version 19.12.5.35793 alone. You can find here a few links to other Primavera P6 Professional (x64) releases:

...click to view all...


How to delete Primavera P6 Professional (x64) from your computer with Advanced Uninstaller PRO

Primavera P6 Professional (x64) is a program released by Oracle Corporation. Sometimes, computer users decide to erase it. This can be difficult because performing this manually requires some advanced knowledge regarding PCs. The best EASY procedure to erase Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Take the following steps on how to do this:





1. If you don't have Advanced Uninstaller PRO already installed on your Windows PC, install it. This is good because Advanced Uninstaller PRO is the best uninstaller and all around utility to clean your Windows computer.

DOWNLOAD NOW

  • visit Download Link
  • download the setup by clicking on the green DOWNLOAD NOW button
  • set up Advanced Uninstaller PRO
2. Run Advanced Uninstaller PRO. It's recommended to take your time to admire the program's design and wealth of functions available. Advanced Uninstaller PRO is a powerful Windows optimizer.

3. Press the General Tools category
Go to General Tools


4. Click on the Uninstall Programs button
Go to Uninstall Programs


5. All the programs existing on the computer will be made available to you

6. Scroll the list of programs until you find Primavera P6 Professional (x64) or simply activate the Search feature and type in "Primavera P6 Professional (x64)". If it is installed on your PC the Primavera P6 Professional (x64) program will be found automatically. Notice that when you select Primavera P6 Professional (x64) in the list of applications, the following data about the program is made available to you:


  • Safety rating (in the lower left corner). The star rating explains the opinion other people have about Primavera P6 Professional (x64), ranging from "Highly recommended" to "Very dangerous".
  • Reviews by other people - Press the Read reviews button.
  • Details about the application you are about to uninstall, by clicking on the Properties button.
7. Press the Uninstall button. A confirmation window will come up. accept the removal by clicking Uninstall. Advanced Uninstaller PRO will then uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After removing Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run a cleanup. Press Next to proceed with the cleanup. All the items of Primavera P6 Professional (x64) that have been left behind will be found and you will be able to delete them. By uninstalling Primavera P6 Professional (x64) using Advanced Uninstaller PRO, you can be sure that no registry entries, files or directories are left behind on your system.

Your system will remain clean, speedy and able to take on new tasks.



Disclaimer

The text above is not a recommendation to remove Primavera P6 Professional (x64) by Oracle Corporation from your PC, we are not saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good software application. This text simply contains detailed instructions on how to remove Primavera P6 Professional (x64) supposing you decide this is what you want to do. Here you can find registry and disk entries that other software left behind and Advanced Uninstaller PRO discovered and classified as "leftovers" on other users' PCs.

2020-11-15 / Written by Andreea Kartman for Advanced Uninstaller PRO

follow @DeeaKartman
Last update on: 2020-11-15 12:59:57.813