Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





How to uninstall Primavera P6 Professional (x64) from your computer

You can find on this page details on how to remove Primavera P6 Professional (x64) for Windows. The Windows version was developed by Oracle Corporation. More information on Oracle Corporation can be found here. The program is frequently located in the C:\Program Files\Oracle\Primavera P6\P6 Professional\18.8.8 directory. Take into account that this path can vary being determined by the user's preference. MsiExec.exe /I{BFB2A2EE-3B78-4E21-BEF0-F5EE911BA9DA} is the full command line if you want to uninstall Primavera P6 Professional (x64). The application's main executable file is titled Primavera.CacheService.exe and occupies 139.35 KB (142696 bytes).

Primavera P6 Professional (x64) installs the following the executables on your PC, taking about 84.92 MB (89041536 bytes) on disk.

  • dbconfig.exe (13.96 MB)
  • PM.exe (69.11 MB)
  • Primavera.CacheService.exe (139.35 KB)
  • Primavera.ImportExport.exe (27.35 KB)
  • Primavera.SQLite.MigrateUI.exe (44.85 KB)
  • Primavera.Visualizer.exe (30.85 KB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

This data is about Primavera P6 Professional (x64) version 18.8.8.31857 alone. You can find below info on other application versions of Primavera P6 Professional (x64):

...click to view all...


How to delete Primavera P6 Professional (x64) with the help of Advanced Uninstaller PRO

Primavera P6 Professional (x64) is an application marketed by Oracle Corporation. Sometimes, users try to erase it. Sometimes this is troublesome because performing this by hand takes some skill regarding removing Windows applications by hand. The best EASY procedure to erase Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here is how to do this:





1. If you don't have Advanced Uninstaller PRO on your Windows system, add it. This is good because Advanced Uninstaller PRO is a very efficient uninstaller and all around utility to optimize your Windows system.

DOWNLOAD NOW

  • go to Download Link
  • download the program by pressing the green DOWNLOAD NOW button
  • install Advanced Uninstaller PRO
2. Run Advanced Uninstaller PRO. It's recommended to take your time to admire Advanced Uninstaller PRO's interface and number of functions available. Advanced Uninstaller PRO is a very good system utility.

3. Click on the General Tools button
Go to General Tools


4. Click on the Uninstall Programs feature
Go to Uninstall Programs


5. All the programs existing on your computer will be shown to you

6. Scroll the list of programs until you locate Primavera P6 Professional (x64) or simply click the Search field and type in "Primavera P6 Professional (x64)". The Primavera P6 Professional (x64) program will be found automatically. When you click Primavera P6 Professional (x64) in the list of programs, the following information regarding the program is available to you:


  • Safety rating (in the left lower corner). The star rating explains the opinion other users have regarding Primavera P6 Professional (x64), ranging from "Highly recommended" to "Very dangerous".
  • Opinions by other users - Click on the Read reviews button.
  • Technical information regarding the app you are about to uninstall, by pressing the Properties button.
7. Press the Uninstall button. A confirmation dialog will appear. accept the removal by pressing the Uninstall button. Advanced Uninstaller PRO will uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After uninstalling Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run a cleanup. Press Next to start the cleanup. All the items that belong Primavera P6 Professional (x64) which have been left behind will be found and you will be asked if you want to delete them. By uninstalling Primavera P6 Professional (x64) with Advanced Uninstaller PRO, you are assured that no Windows registry items, files or directories are left behind on your computer.

Your Windows PC will remain clean, speedy and ready to serve you properly.



Disclaimer

The text above is not a recommendation to remove Primavera P6 Professional (x64) by Oracle Corporation from your computer, we are not saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good software application. This page simply contains detailed instructions on how to remove Primavera P6 Professional (x64) supposing you want to. Here you can find registry and disk entries that other software left behind and Advanced Uninstaller PRO stumbled upon and classified as "leftovers" on other users' PCs.

2022-02-17 / Written by Andreea Kartman for Advanced Uninstaller PRO

follow @DeeaKartman
Last update on: 2022-02-17 19:55:39.433