Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A way to uninstall Primavera P6 Professional (x64) from your PC

This page contains detailed information on how to remove Primavera P6 Professional (x64) for Windows. It is produced by Oracle Corporation. More data about Oracle Corporation can be seen here. The program is often found in the C:\Program Files\Oracle\Primavera P6\P6 Professional directory. Take into account that this path can differ depending on the user's preference. The entire uninstall command line for Primavera P6 Professional (x64) is MsiExec.exe /I{013DCE0F-C68C-4119-A611-C9BC081F89BF}. Primavera P6 Professional (x64)'s primary file takes around 18.82 KB (19272 bytes) and its name is Primavera.ImportExport.exe.

The executables below are part of Primavera P6 Professional (x64). They occupy about 83.78 MB (87845824 bytes) on disk.

  • dbconfig.exe (13.40 MB)
  • PM.exe (68.67 MB)
  • Primavera.ImportExport.exe (18.82 KB)
  • Primavera.Mimosa.exe (23.82 KB)
  • Primavera.SQLite.MigrateUI.exe (33.82 KB)
  • Primavera.Visualizer.exe (22.82 KB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

The current web page applies to Primavera P6 Professional (x64) version 17.12.8.29377 alone. For other Primavera P6 Professional (x64) versions please click below:

...click to view all...


How to uninstall Primavera P6 Professional (x64) from your PC using Advanced Uninstaller PRO

Primavera P6 Professional (x64) is an application offered by the software company Oracle Corporation. Sometimes, computer users choose to erase it. Sometimes this can be easier said than done because removing this manually takes some skill regarding removing Windows programs manually. The best EASY action to erase Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here is how to do this:





1. If you don't have Advanced Uninstaller PRO on your system, add it. This is a good step because Advanced Uninstaller PRO is an efficient uninstaller and general tool to clean your computer.

DOWNLOAD NOW

  • navigate to Download Link
  • download the setup by pressing the green DOWNLOAD button
  • set up Advanced Uninstaller PRO
2. Start Advanced Uninstaller PRO. It's recommended to take your time to get familiar with Advanced Uninstaller PRO's design and number of tools available. Advanced Uninstaller PRO is a powerful package of utilities.

3. Click on the General Tools category
Go to General Tools


4. Press the Uninstall Programs tool
Go to Uninstall Programs


5. All the applications existing on the PC will be shown to you

6. Scroll the list of applications until you locate Primavera P6 Professional (x64) or simply click the Search feature and type in "Primavera P6 Professional (x64)". The Primavera P6 Professional (x64) program will be found very quickly. Notice that when you click Primavera P6 Professional (x64) in the list of programs, some information about the program is available to you:


  • Star rating (in the left lower corner). This tells you the opinion other people have about Primavera P6 Professional (x64), ranging from "Highly recommended" to "Very dangerous".
  • Reviews by other people - Click on the Read reviews button.
  • Technical information about the app you want to uninstall, by pressing the Properties button.
7. Press the Uninstall button. A confirmation window will come up. accept the removal by clicking the Uninstall button. Advanced Uninstaller PRO will automatically uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After uninstalling Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run a cleanup. Press Next to go ahead with the cleanup. All the items that belong Primavera P6 Professional (x64) that have been left behind will be detected and you will be able to delete them. By removing Primavera P6 Professional (x64) using Advanced Uninstaller PRO, you can be sure that no Windows registry entries, files or directories are left behind on your PC.

Your Windows PC will remain clean, speedy and ready to serve you properly.



Disclaimer

This page is not a piece of advice to remove Primavera P6 Professional (x64) by Oracle Corporation from your computer, nor are we saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application. This text only contains detailed info on how to remove Primavera P6 Professional (x64) supposing you want to. The information above contains registry and disk entries that other software left behind and Advanced Uninstaller PRO stumbled upon and classified as "leftovers" on other users' computers.

2019-01-24 / Written by Daniel Statescu for Advanced Uninstaller PRO

follow @DanielStatescu
Last update on: 2019-01-24 08:50:33.893