Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A way to uninstall Primavera P6 Professional (x64) from your computer

You can find on this page detailed information on how to remove Primavera P6 Professional (x64) for Windows. It was coded for Windows by Oracle Corporation. More data about Oracle Corporation can be seen here. Primavera P6 Professional (x64) is normally set up in the C:\Program Files\Oracle\Primavera P6\P6 Professional folder, however this location may differ a lot depending on the user's option when installing the program. The full command line for uninstalling Primavera P6 Professional (x64) is MsiExec.exe /I{004E9BF5-A279-4CF1-B46F-55E0EA270A08}. Note that if you will type this command in Start / Run Note you may get a notification for admin rights. The application's main executable file has a size of 79.52 KB (81424 bytes) on disk and is labeled Primavera.AdminConfig.exe.

The following executables are installed along with Primavera P6 Professional (x64). They take about 130.83 MB (137186992 bytes) on disk.

  • dbconfig.exe (13.31 MB)
  • DistributedJobsAdmin.exe (3.76 MB)
  • PM.exe (68.50 MB)
  • Primavera.AdminConfig.exe (79.52 KB)
  • Primavera.ImportExport.exe (18.02 KB)
  • Primavera.Mimosa.exe (23.02 KB)
  • Primavera.SQLite.MigrateUI.exe (33.02 KB)
  • Primavera.Visualizer.exe (22.02 KB)
  • prmjob.exe (26.68 MB)
  • PrmJobSv.exe (16.80 MB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

The information on this page is only about version 17.12.0.26145 of Primavera P6 Professional (x64). Click on the links below for other Primavera P6 Professional (x64) versions:

...click to view all...


A way to remove Primavera P6 Professional (x64) from your computer with Advanced Uninstaller PRO

Primavera P6 Professional (x64) is a program offered by the software company Oracle Corporation. Frequently, users decide to remove this application. This can be efortful because performing this by hand requires some experience related to removing Windows programs manually. The best QUICK solution to remove Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here is how to do this:





1. If you don't have Advanced Uninstaller PRO on your Windows PC, add it. This is good because Advanced Uninstaller PRO is the best uninstaller and all around utility to take care of your Windows computer.

DOWNLOAD NOW

  • visit Download Link
  • download the setup by pressing the DOWNLOAD button
  • install Advanced Uninstaller PRO
2. Run Advanced Uninstaller PRO. Take your time to get familiar with Advanced Uninstaller PRO's design and wealth of functions available. Advanced Uninstaller PRO is a very useful system optimizer.

3. Click on the General Tools category
Go to General Tools


4. Activate the Uninstall Programs feature
Go to Uninstall Programs


5. A list of the programs existing on the computer will appear

6. Navigate the list of programs until you find Primavera P6 Professional (x64) or simply click the Search field and type in "Primavera P6 Professional (x64)". The Primavera P6 Professional (x64) program will be found automatically. After you select Primavera P6 Professional (x64) in the list , some information regarding the application is made available to you:


  • Safety rating (in the left lower corner). This tells you the opinion other users have regarding Primavera P6 Professional (x64), from "Highly recommended" to "Very dangerous".
  • Reviews by other users - Click on the Read reviews button.
  • Technical information regarding the program you wish to uninstall, by pressing the Properties button.
7. Press the Uninstall button. A confirmation dialog will appear. accept the removal by clicking Uninstall. Advanced Uninstaller PRO will then remove Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After removing Primavera P6 Professional (x64), Advanced Uninstaller PRO will offer to run a cleanup. Press Next to proceed with the cleanup. All the items of Primavera P6 Professional (x64) that have been left behind will be found and you will be able to delete them. By uninstalling Primavera P6 Professional (x64) with Advanced Uninstaller PRO, you can be sure that no Windows registry entries, files or folders are left behind on your PC.

Your Windows computer will remain clean, speedy and able to serve you properly.



Disclaimer

This page is not a recommendation to uninstall Primavera P6 Professional (x64) by Oracle Corporation from your computer, nor are we saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application for your PC. This page simply contains detailed info on how to uninstall Primavera P6 Professional (x64) in case you decide this is what you want to do. The information above contains registry and disk entries that other software left behind and Advanced Uninstaller PRO stumbled upon and classified as "leftovers" on other users' computers.

2018-01-23 / Written by Daniel Statescu for Advanced Uninstaller PRO

follow @DanielStatescu
Last update on: 2018-01-23 16:57:51.427