Publishers

Primavera P6 Professional (x64) Primavera P6 Professional (x64)





A way to uninstall Primavera P6 Professional (x64) from your PC

This page is about Primavera P6 Professional (x64) for Windows. Below you can find details on how to uninstall it from your computer. The Windows release was created by Oracle Corporation. You can read more on Oracle Corporation or check for application updates here. Usually the Primavera P6 Professional (x64) program is installed in the C:\Program Files\Oracle\Primavera P6\P6 Professional\19.12.4 folder, depending on the user's option during install. You can uninstall Primavera P6 Professional (x64) by clicking on the Start menu of Windows and pasting the command line MsiExec.exe /I{3182FB9F-1FD8-49F7-8621-2A74394CA8A8}. Note that you might get a notification for admin rights. The application's main executable file has a size of 140.13 KB (143496 bytes) on disk and is called Primavera.CacheService.exe.

Primavera P6 Professional (x64) contains of the executables below. They take 85.07 MB (89200904 bytes) on disk.




  • dbconfig.exe (13.60 MB)
  • PM.exe (69.62 MB)
  • Primavera.CacheService.exe (140.13 KB)
  • Primavera.ImportExport.exe (27.63 KB)
  • Primavera.SQLite.MigrateUI.exe (44.64 KB)
  • Primavera.Visualizer.exe (30.63 KB)
  • P330XERConvert.exe (798.38 KB)
  • XERP330Convert.exe (786.38 KB)
  • batch32.exe (38.41 KB)
  • BTREGSET.EXE (32.86 KB)
...click to view all...

This page is about Primavera P6 Professional (x64) version 19.12.4.35488 alone. For more Primavera P6 Professional (x64) versions please click below:

...click to view all...


How to delete Primavera P6 Professional (x64) from your PC with the help of Advanced Uninstaller PRO

Primavera P6 Professional (x64) is a program marketed by the software company Oracle Corporation. Sometimes, people want to uninstall this application. Sometimes this is hard because removing this manually requires some skill regarding PCs. One of the best SIMPLE solution to uninstall Primavera P6 Professional (x64) is to use Advanced Uninstaller PRO. Here is how to do this:





1. If you don't have Advanced Uninstaller PRO on your Windows system, install it. This is good because Advanced Uninstaller PRO is an efficient uninstaller and all around utility to maximize the performance of your Windows system.

DOWNLOAD NOW

  • navigate to Download Link
  • download the setup by pressing the DOWNLOAD NOW button
  • install Advanced Uninstaller PRO
2. Start Advanced Uninstaller PRO. Take some time to admire Advanced Uninstaller PRO's design and wealth of functions available. Advanced Uninstaller PRO is a powerful system utility.

3. Press the General Tools button
Go to General Tools


4. Click on the Uninstall Programs feature
Go to Uninstall Programs


5. A list of the programs existing on your PC will be shown to you

6. Scroll the list of programs until you find Primavera P6 Professional (x64) or simply click the Search field and type in "Primavera P6 Professional (x64)". The Primavera P6 Professional (x64) app will be found automatically. After you click Primavera P6 Professional (x64) in the list of apps, the following data regarding the program is available to you:


  • Safety rating (in the lower left corner). This explains the opinion other people have regarding Primavera P6 Professional (x64), ranging from "Highly recommended" to "Very dangerous".
  • Reviews by other people - Press the Read reviews button.
  • Technical information regarding the program you want to remove, by pressing the Properties button.
7. Click the Uninstall button. A window asking you to confirm will show up. Confirm the removal by clicking Uninstall. Advanced Uninstaller PRO will uninstall Primavera P6 Professional (x64).
Uninstall Primavera P6 Professional (x64)


8. After removing Primavera P6 Professional (x64), Advanced Uninstaller PRO will ask you to run an additional cleanup. Click Next to start the cleanup. All the items that belong Primavera P6 Professional (x64) that have been left behind will be detected and you will be able to delete them. By uninstalling Primavera P6 Professional (x64) using Advanced Uninstaller PRO, you can be sure that no registry items, files or folders are left behind on your computer.

Your system will remain clean, speedy and able to take on new tasks.



Disclaimer

The text above is not a recommendation to remove Primavera P6 Professional (x64) by Oracle Corporation from your computer, nor are we saying that Primavera P6 Professional (x64) by Oracle Corporation is not a good application for your PC. This page simply contains detailed info on how to remove Primavera P6 Professional (x64) in case you want to. The information above contains registry and disk entries that Advanced Uninstaller PRO discovered and classified as "leftovers" on other users' PCs.

2024-05-29 / Written by Daniel Statescu for Advanced Uninstaller PRO

follow @DanielStatescu
Last update on: 2024-05-29 09:44:06.887